Case Study: RAF Marham


Argon has secured this new and exciting project with the Ministry of Defence at RAF Marham, Kings Lynn. The Ministry of Defence have invested £135m in new facilities in preparation for the arrival of the F-35B Lightning II aircraft in 2018 which will keep the nation safe.

The new mains and service infrastructure is been installed to feed new buildings throughout the site
Argon are currently undertaking large diameter connections (355mm and 400mm) and will commission the new infrastructure. The works were carried out in collaboration with Balfour Beatty, Integral, Wates and Galliford Try.